Τηλ.: +30 23810 89485 | +30 6937226117

SWITCH FROM TUBULAR BLEEDING LINE TO TWIN-TRACK LINE

The system is used for switching the carcasses (change of feet) from the tubular bleeding line to the aluminium twin-track processing line.

Made of hot-dip galvanized steel with zinc coating thickness 0,8-0,9mm.

Includes a controller of pneumatic operation with 3 positions, a ram D80 and 600mm route.

Maximum pressure 6bar.

Contact us

Watch Dragon ball super